North Babylon Public Library, Long Island, NY
Project Details & Design Approach
UPDATE: We are pleased to announce that we’ve been awarded Phase 2 of the North Babylon Public Library project, which includes heating, ventilation, and air conditioning. Phase 1, the lighting retrofit is under construction and is going well with an estimated 80% savings on lighting costs.
Challenges
- Navigate the path through the State Education Department
- Provide energy retrofits that supply equal or better performance at reduced energy costs
- Demonstrate to the client their initial cost, energy savings and return on investment
Objectives
- Reduce the library’s carbon footprint
- Save money
- Enhance the library experience
Features
- Increase total amount of ambient light in the library
- Dramatically reduce the lighting cost
- Ease of installation, minimal disruption